  1. Midius ProjectPlanner 1.2.5
  2.  
  3. Date of Release: 24 October 1999
  4.  
  5. The Midius ProjectPlanner is a Macintosh program for making time schedules (Gantt charts).
  6.  
  7. The Project Planner folder contents:
  8. - ProjectPlanner README 1.2.5      this file
  9. - Midius ProjectPlanner                fat version of the program
  10. - User's manual                             the user's manual in pdf (Acrobat) format
  11. - (HTML)                                        folder that contains small GIF-files (pictures)
  12.                                                      that are necessary to be able to view a Gantt chart
  13.                                                      exported in HTML format.
  14. - Register                                     program for creating register forms to be sent to Kagi 
  15.  
  16. Requirements:
  17. System 7.1 or later
  18. 68020 or better
  19. Colour display is required
  20.  
  21. Registering
  22. To register use the Register program to create a register form which then shall be sent
  23. to Kagi Shareware using mail, email or fax.
  24.  
  25. The price for a single license is 35 USD, there are also site and world licenses available for
  26. 600 USD resp. 2500 USD.
  27.  
  28. http://www.kagi.com
  29. Email: shareware@kagi.com        (1 to 3 day processing time delay)
  30. FAX: +1 510 652 6589            (4 to 8 day processing time delay)
  31. Postal address:                       (4 to 8 day delay plus transit time to Kagi)
  32. Kagi
  33. 1442-A Walnut Street PMB #392-MU
  34. Berkeley, California, 94709-1405
  35. USA
  36.  
  37. Please note that Kagi automatically rejects any electronic payment that come includes
  38. a hotmail.com address. Refer to http://www.kagi.com/FAQs/hotmail.com
  39.  
  40. N.B. Kagi is a payment processing company and they are not the author/shipper of the
  41. product. Any problems with receiving registration codes or any problems with the product itself shall be addressed to the author at m-arc@algonet.se or micke@kagi.com
  42.  
  43. Registration codes will be sent to you normally within a week after receive a
  44. confirmation of your order from Kagi.
  45.  
  46.  
  47. Disclaimer
  48. This software is provided "as-is". I take no responsiblity in any damage caused by the
  49. software, use of the software or any of its outputs. Use it at your own risk.
  50.  
  51.  
  52. Changes in 1.2.5 (24 October 1999)
  53. • Corrected a bug that caused changes in the calendar not always being stored properly.
  54. • Corrected a bug that caused columns hidden by the Gantt chart still being printed
  55.    (inside the Gantt chart).
  56. • Corrected a bug that could cause a hang when adding new columns using the
  57.    Columns dialog.
  58. • Added possibility to have fractions of an hour in the base week dialog.
  59. • Added possibility to suppress the time information in the date columns. The time
  60.    information will be visible and editable whenever such a column is in focus but
  61.    moving out of the column will hide the time information. This new user preference
  62.    checkbox can be found in the Columns dialog.
  63. • Corrected a bug that made it impossible to get an activity line drawn in the Gantt chart
  64.    without using the mouse and the activity tool.
  65. • Corrected a bug that caused a freeze when displaying the Cost palette and any activity
  66.    had an undefined stop date.
  67.  
  68.  
  69. Known Bugs
  70.  
  71. • When printing a time chart with a activity table spanning over two pages, horizontally,
  72.    the output is not as beatiful as it should be...
  73. • You cannot make schedules with starting dates prior to 1986.
  74. • Having a schedule spanning over a long period and displaying it with a high
  75.    "resolution" (e.g. timescale=days) will cut off some parts of the time schedule.
  76. • When entering the year with only two digits, e.g. 14/12/97 the MacOS rules
  77.    are used to determine the century:
  78.      If the value of the input year is less than 100, StringToDate determines the year as follows.
  79.       1. If (current year) MOD 100 is greater than or equal to 90 and the input year is less than
  80.       or equal to 10, the input year is assumed to be in the next century.
  81.       2. If (current year) MOD 100 is less than or equal to 10 and the input year is greater than
  82.       or equal to 90, the input year is assumed to be in the previous century.
  83.       3. Otherwise, the input year is assumed to be in the current century.
  84.       If the value of the input year is between 100 and 1000, then 1000 is added to it. Thus the
  85.       dates 1/9/87, 1/9/987, and 1/9/1987 are equivalent.
  86.  
  87. Use the web-page http://www.softsys.se/ProjectPlanner/ to get new releases etc. 
  88.  
  89. Questions concerning the program can be sent directly to the author at m-arc@algonet.se or
  90. micke@kagi.com
  91.  
  92.  
  93. This program should only travel in the complete folder.
  94.  
  95. Have fun,
  96.  
  97.                 Mikael Arctaedius
  98.         Stockholm, Sweden
  99.  
  100.         email: m-arc@algonet.se
  101.         http://www.softsys.se/ProjectPlanner/
  102.  
  103.  
  104.  
  105. Release History
  106.  
  107. Changes in 1.2.4 (10 October 1999)
  108. • Corrected a bug which could cause a hang in certain situations when moving focus
  109.    (i.e. moving the text cursor) from the work or duration column.
  110. • Corrected some errors related to computing the stop date. Sometimes the stop date
  111.    changed depending on which column you moved focus from.
  112. • Corrected yet another problem with scrolling. Sometimes when scrolling the Gantt
  113.    diagram horizontally, it wasn't properly updated.
  114. • Corrected a bug which caused only a few lines of an imported file to actually be imported.
  115. • Corrected some other problems related to the import feature.
  116. • General clean-up in how columns affect each other.
  117.  
  118. Changes in 1.2.3 (15 August 1999)
  119. • Corrected a bug which could cause a hang if the work and start time columns contained
  120.    data but the stop time was empty.
  121. • Corrected a bug which caused a crash if one deleted the very last row of the table and
  122.    it was a closed summary.
  123. • Corrected a bug that was introduced with 1.2.2; when scrolling horizontally the right
  124.    pane was not properly updated.
  125. • Corrected a bug that made collapsed summaries be printed as ordinary activities.
  126. • Corrected a bug that caused activities with no start date not to be printed.
  127. • Made it possible to use decimal values for team member's cost field, i.e. the hourly rate
  128.    can now be for example 50.5 USD or 50,75 GBP. (The decimal character is defined in the
  129.    Numbers control panel.)
  130. • Added a "Current expenditure" column in the cost palette. The value in this column
  131.    corresponds to the Completed column in the activity table. (This column can
  132.    enabled/disabled in the preferences dialog.)
  133. • Added a "Current expenditure" column to the Report View. The column can be
  134.    enabled/disabled using the ordinary Setup Columns-dialog.
  135. • Added checks for jpeg compression software to be installed before enabling the JPEG
  136.    alternative in the export picture dialog.
  137.  
  138. Changes in 1.2.2 (25 July 1999)
  139. • Changed behaviour of the "RETURN" key. Previously the cursor was moved to the beginning
  140.    of the next line (i.e. to the first coulmn of the next line) now it is moved to the row but
  141.    stays in the same column.
  142. • Corrected some strange behaviour that occured when an activity was selected and then
  143.    the text bursor was positioned in a text field of that row. Previously three mouse clicks
  144.    could be necessary to get the text cursor where you wanted it.
  145. • Corrected a bug that caused the text cursor to stay in the same row when RETRUN was hit
  146.    and a new row had to be created (i.e. the text cursor was already positioned in the last
  147.    row).
  148. • Added automatic scrolling when the textcursor becomes invisible due to moving the cursor
  149.    to an activity row that is not visible.
  150. • Fixed quite a few drawing problems.
  151. • Links can now be deleted by selecting them and then press either backspace (delete) or
  152.    the forward delete key.
  153. • Horizontal scrolling now works even if all summaries are "closed".
  154. • The View menu now has a checkmark indicating which view that is active.
  155. • Corrected some other obscure problems (writing to NIL etc.)
  156.  
  157. Changes in 1.2.1 (8 February 1999)
  158. • Corrected computation of work cost.
  159. • Corrected handling of locked stop dates. The stop date will now remain fixed even when
  160.    the work column or the responsible column content is modified.
  161. • Changed to a newer (8.5 compatible) version of Mercutio MDEF.
  162.  
  163. Changes in 1.2 (17 January 1999)
  164. • The right hand pane is now updated (and adjusted) when an activity's start date
  165.    is set to a date prior to the current start date of the schedule.
  166. • Removed a big memory leak in the drag-and-drop implementation. After doing
  167.    a few drag-and-drops, memory was exhausted causing all kinds of strange errors.
  168. • Corrected a bug that caused messed up activity rows if you dragged a group of
  169.    activities and dropped them right below themselves (i.e. no actual move was
  170.    performed).
  171. • Corrected a bug that caused the duration column of summaries to be left empty
  172.    unless the original start/stop dates had been set.
  173. • Corrected a bug that caused the summary row to have a responsible after converting
  174.    an ordinary row into a summary row.
  175. • Corrected a bug that cuased some problems when pasting an ordinary row (i.e. not a
  176.    sub-activity) into a summary group.
  177. • Corrected a bug that made adjusted (due to links) activities start 5 pm instead of
  178.    moving them to the next day 8 am.
  179. • Corrected a bug that could cause crashes if you entered activity names longer
  180.    than 100 characters.
  181. • Added a simple report view where each team member's assignments are listed.
  182. • Added possibility to lock an activity (either start or stop date is locked).
  183. • Made it impossible to paste a row onto a summary header row.
  184. • The Print preview picture is a bit more detailed, including the footer if present and
  185.    is correctly scaled.
  186. • And some minor screen updating problems have been fixed.
  187.  
  188. Changes in 1.1.3 (21 August 1998)
  189. • Corrected a bug that sometimes caused a crash when doing an "Insert row".
  190. • Corrected a bug that caused an erroneous menu item to appear in the help menu.
  191.  
  192. Changes in 1.1.2 (20 August 1998)
  193. • Corrected a bug that made it impossible to actually turn off the print
  194.    option "Fit to page". (The checkbox in the Printer Options dialog was
  195.    unchecked but the output on the printer was still scaled to fit the page.)
  196. • Made it possible to select (and delete) a link (between to adjacent activities)
  197.    consisting of a single vertical line.
  198. • Corrected a bug that caused some problems with deleted dependency links.
  199.    When a dependency link had been deleted it was impossible to add a new link
  200.    between the same two activities unless the document was saved in between
  201.    the deletion and the creation of a new link.
  202. • Corrected a bug that could cause some spurious crashes (especially when
  203.    Navigation Services extension is active).
  204. • Added possibility to clear Original dates for activities.
  205.  
  206. Changes in 1.1.1 (6 August 1998)
  207. • Corrected some crash bugs related to the date fields.
  208. • Corrected a bug that got ProjectPlanner into an endless loop if entering a
  209.    duration of 0 days.
  210.  
  211. Changes in 1.1 (3 August 1998)
  212. • Corrected some crash bugs related to selecting/deselecting the activity field.
  213. • The Enter key (beside the numerical keypad) is now treated like the return key.
  214. • When the "Completed" tool is selected the completed percentage value is displayed
  215.    in the lower left corner.
  216. • The delete key can now be used instead of the Edit->Clear menu commmand to delete
  217.    a chart element.
  218. • Corrected the behaviour of some OK buttons in dialogs.
  219. • Corrected the saving of Page Setup settings.
  220. • Corrected a bug that made ProjectPlanner freeze in a never-ending loop when
  221.    changing size of a column under certain conditions.
  222. • Made it compatible with CustomMenus.
  223. • Added an "Import data" feature.
  224. • Modified the "Export data..." dialog so that it is possible to choose between exporting
  225.    all columns or only visible columns.
  226. • Removed "Not registered" text on printouts.
  227. • Added auto-completion of the responsible text field.
  228. • Shift TAB can now be used to move backwards through the cells in the table.
  229. • Added a new preference option: "auto-optimize activities". If it is enabled, all
  230.    linked activities will always be adjusted to produce the shortest possible duration.
  231. • Better screen update of dependency links.
  232. • Added simple HTML output.
  233. • Corrected some problems with computation of work and stopdate when the duration
  234.    was changed.
  235. • Changed to a newer version of the Mercutio API. The previous version did cause quite
  236.    a few repeatable crashes which now are gone.
  237. • The date in the lower left corner is now updated also when you move or change
  238.    duration of an activity. In the case of mving an activity, the new start date is
  239.    displayed, and in the case of changing the duration the new stop date is displayed.